Pft- Cped
6 giorni fa
**Position Summary with Job Responsibilities**:
Position Name: Fix Term-Construction PVBU
Position level:Level 5 Fix Term
DEM position name: Head Construction-Technical Services.
DEM position level: Level 4
Purpose of the position
To execute, monitor of Construction activities for new infrastructure facilities to enhance the capacities, improvement, and maintenance of all civil structures / facilities with respect to SQDCME parameters.
Size
Financial Non-Financial
VME budget
- Direct Reports:
Inventory
- Indirect Reports:
Revenue
- Volumes:
MS:
Communication Network
INTERNAL EXTERNAL
Entity Nature of Communication Entity Nature of Communication
Mfg Planning Preparing Budgetary estimates,ESR estimates, Cost Optimization related to new infrastructure requirements/projects Factory Inspector Execution of work as per the plans submitted to Factory Inspector & local bodies.
Ensuring confirmation of work as per Legatrix.
CPED Coordination with CPED for their Civil requirements related to Utilities/PCB requirements for various projects /improvements. Vendor Park NA
Manufacturing 1. Implementing the capacity enhancement projects in shop.
2. Planning for shutdowns with coordination of shop personals.
3. Attending emergency requirements for ensuring smooth production.
4. Ensuring Safety while working, Quality of end product, delivery as per time lines committed with in the given budget & adherence to the ISO 14001 guide lines.
Contractors 1. Tracking of all Contractor activities.
2. Monitoring of Contractor resources wrt the time lines committed.
3. Monthly contractor billing.
4. Ensuring safe working of Contractor as per the Safety standards.
5. Monitoring the work execution processes of the contractor for Quality output.
6.Monitoring the adherence to Environment standard by the contractor
Finance Verification of Contractor bills Consultants Coordination with Consultants for obtaining stability certificate
Maintenance 1. Maintaining the health of plant by periodic maintenance of infrastructure.
Contract Cell NA
Construction (Other locations) Technical details, knowledge sharing & necessary approvals
Purchase Material procurement for new infrastructure as well as for maintenance works.
Personal Profile
Education B.E. / B. Tech. (Civil Engg.)
Skills/ Competencies
Behavioural (Tata Leadership Practices) Functional/Technical
1.Drive for Results Executes New Construction Projects
2.Self-motivated Executes the maintenance of existing infrastructure.
3.Timely decision Making Estimation & billing.
4.Customer centric Establish team goal as well as individual goal, generates new idea & is open to new ideas.
5.Works in team
Relevant Experience:
1. 1-2 Years end to end Experience working in Automobiles / Industrial background.
**Education**:
**Work Experience**:
Key Responsibilities:
1-New Infrastructure Execution:
- 1. Study of the infrastructure details & logistics requirements of the new project based on factory layout & equipment planning by the Planning department.
2. Working out the budget requirements/timelines and alternatives.
3. Working of preliminary infrastructure budget plan based on inputs from the planning team for necessary approvals.
4. Monitoring of execution of work for all stages of work from scratch to handover for SQDCME parameters.
5. Computing the resources required for the Construction works along with the contractor & monitoring the same.
6. Finalize broad timelines for major sub phases and review progress against the planned schedules on a weekly basis along with CPED & planning teams.
7. Monitor and control the project activities within the budgeted cost, quality and time schedule by realignment of various resources from time to time.
Time & Cost(Budget Vs Actual)
2-Vendor Finalization:
- Coordinate with vendors post PO release to understand their resource mobilization & execution plan
Time & Cost
3-Material Procurement:
- 1. Computation of material requirements based on the approved designs & drawings.
2. Ensuring material consumption entry in monthly billing.
3. Inspection of bulk/critical deliveries in order to ensure adherence to technical specifications and implementing cross checking standards.
4. Verify the physical stock at the contractor site to control wastage within limits and regulate future procurement on a monthly basis.
5. Monitor the mode of transportation to different sites within the plant premises in order to ensure adherence to safety standards.
Time, Cost & Quality (Budget Vs Actual)
4-Capacity Enhancement in existing shops:
- 1. Provide inputs/suggestions for the drawing issued after Carrying out the feasibility study at site based on the drawing issued.
2.Study the constraints to regular production at the time of execution and suggest corrective actions to remove bottlenecks prior to execution
3. Study of detail design / execution drawings post review and release for execution; Modify/suggest improvements(if any) prior to approval
4. Supervision of the execution activities